However, it’s important that you don’t use more than 160 amps at once. But the wiring diagram shouldn’t exceed the circuitry’s 200-amp limit.įor example, you might only connect two 100 amp or one 200 amp sub panel from 200 amp main. You can typically run two or more 100-amp sub panels from a 200-amp main service panel. Helpful Tips/FAQsĬan I Run Two 100 Amp Sub Panel Off 200 Amp Main? Turn on the main circuit breaker and activate the 100-amp panel to test the wiring.
#200 amp breaker disconnect switch install#
With the connections secure, install the circuit breakers you need for the sub panel. Make sure to use the neutral lug kit to secure this attachment. The next step is to connect and secure the other ends of the feeder wires to the sub panel, particularly its neutral bus bar. Then, install that circuit breaker to the main panel. Connect the two feeder wires to the 100-amp breaker. Next, wiring a subpanel with 3 wires typically needs you to feed the feeder wire through the PVC conduit. Secure the other end of the ground wire to the sub panel’s ground bar. To run a 100 amp sub panel off a 200 amp main panel, feed the ground wire through the PVC conduit and secure it to the main panel’s ground bar.

Once finished, place a sticker indicating the specifics of the ground bars for future reference. The next part of the 100 amp sub panel installation is to attach the ground bars. The PVC will become the conduit that’ll hold some of the 100 amp sub panel wiring. Remember to scrape the edges of the pipes beforehand to smoothen them. Cut the next PVC section and glue them to the previous ones with cement. Next, install two small PVC fittings into the knockout covers of both the main and sub panels. Another option is to jam a pair of pliers into the covers to remove them. Do the same for the knockout covers on the sub panel. Remove the knockout covers from the side of the main panel by pounding them with a hammer and a flathead screwdriver. Don’t forget to verify that the circuit is off with a multimeter. This step often only demands you turning off the main breaker from the main service panel. That way, you can prevent risks of accidents and injuries, particularly from electrocutions. Step #2: Turn Off The Main Breakerĭeactivate the power from the main service panel any time that you’re working with breaker boxes. Ensure that the sub panel has at least 3 feet of space from other items to promote accessibility and safety. Remember, adding a 100 amp subpanel means ensuring that it has adequate clearance from the main panel and other objects in the area.


Then, place the panel to your preferred location on the wall or on a durable structure. Place and secure the plywood sheet to the back of the sub panel’s enclosure. Next, cut a 4×4-foot plywood sheet, which will become the panel’s anchor. Safety gear (gloves, glasses, insulated shoes)įirst, ensure that your mounting location and position follows the standards imposed by your local electrical code.